Skip to content
Project intake

Submit a Project Audit

Share the job specs, freight notes, and open questions Tony needs to review the project and follow up with a practical next step.

Saved to project spreadsheet Reviewed for follow-up No checkout required
Before a quote moves

Better details make the recommendation cleaner.

This intake is for pond builds, upgrades, contractor packages, and freight-sensitive orders. It is not a final engineering plan, but it gives A-Eco the right information to spot missing details before anyone commits to equipment.

System sizingGallons, dimensions, depth, fish load, and current equipment.
Flow questionsPump, head height, waterfall, UV, plumbing, and retrofit notes.
Project timingQuote deadline, install window, budget range, and decision stage.
Freight realityZIP code, delivery access, liftgate needs, and jobsite constraints.

1. Pond type

2. Pond size and site

3. Current system

4. Fish load and goal

5. Timeline and budget

6. Freight and delivery

7. Contact and files

Tony will review your details, check what needs confirming, and follow up with the next best direction.

Browse suggested collection